logoGlobal Energy Interconnection

Contents

Figure(0

    Tables(0

      Global Energy Interconnection

      Volume 3, Issue 6, Dec 2020, Pages 562-570
      Ref.

      Multiobjective optimal dispatch of microgrid based on analytic hierarchy process and quantum particle swarm optimization

      Yuxin Zhao1 ,Xiaotong Song1* ,Fei Wang2 ,Dawei Cui3
      ( 1.School of Electrical and Control Engineering,North China University of Technology,Beijing 100144,P.R.China , 2.State Grid Shandong Electric Power Company,Jinan 250001,P.R.China , 3.State Grid Brazil Holding S.A.,Rio de Janeiro,20071-004,RJ,Brasil )

      Abstract

      Owing to the rapid development of microgrids (MGs) and growing applications of renewable energy resources,multiobjective optimal dispatch of MGs need to be studied in detail.In this study,a multiobjective optimal dispatch model is developed for a standalone MG composed of wind turbines,photovoltaics,diesel engine unit,load,and battery energy storage system.The economic cost,environmental concerns,and power supply consistency are expressed via subobjectives with varying priorities.Then,the analytic hierarchy process algorithm is employed to reasonably specify the weight coefficients of the subobjectives.The quantum particle swarm optimization algorithm is thereafter employed as a solution to achieve optimal dispatch of the MG.Finally,the validity of the proposed model and solution methodology are confirmed by case studies.This study provides reference for mathematical model of multiojective optimization of MG and can be widely used in current research field.

      0 Introduction

      It is a well-known and recognized fact that renewable power generation is an effective means to resolve the global environmental concerns regarding fossil fuel consumption and energy crisis [1].Nowadays,a growing proportion of the generated renewable energy,such as wind and solar power,is employed to power loads via microgrids (MGs)rather than the traditional distribution grids [2-4].Therefore,optimal dispatch of the MGs is critical for promoting the application and accommodation of renewable energies [5].

      Studies on the optimal dispatch of MGs have garnered attention in this regard [6].Several frameworks have been proposed for optimal dispatch to coordinate the output power of each MG unit and minimize its operational cost and pollutant emission [7,8].The mathematical models for optimal dispatch of the MGs are characterized by diversity and complexity,as numerous decision variables,constraint variables,and multiple subjects are involved [9].The multiobjective optimal dispatch scheme considers the economic cost,environmental concerns,and consistency of power supply.The economic cost is composed of operational,maintenance,and fuel costs of the distributed units.The environmental concerns and power supply consistency can be quantified by the pollution treatment costs and load interruption,respectively [10].It should be noted that conflicts between these multiple objectives pose considerable challenges to the optimal dispatch of the MGs.Some researchers have employed intelligent algorithms,such as the genetic algorithm,to obtain a series of paretooptimal solutions [11];however,decision makers still need to choose an optimal solution from the available solution set.In [12],the price penalty factor as well as linear weighting methods wasused to transform the multiple objectives into a single objective.Furthermore,the analytic hierarchy process (AHP) algorithm has shown adequate capability to determine the weight coefficients for the aforementioned intelligent algorithms [13-15].

      The complexities in the mathematical models for optimal dispatch of the MGs necessitate studies on appropriate solution methodologies.The strong nonlinearities in the MG models challenge the traditional optimization algorithms but favor intelligent algorithms in some cases.The nondominated sorting genetic algorithm (NSGA-Ⅱ) was proposed to optimize the MG dispatch in [16].To solve the dual-objective optimization problem,the multiobjective bacterial colony chemotaxis (MOBCC) algorithm was employed to produce a pareto-optimal solution set with attractive simulation results in [17].

      However,the multiple objectives of MG dispatch,with varying priorities,need to be studied in depth since as the concerns of various stakeholders should be appropriately considered.To fill this gap,an optimal dispatch model for the MG with varying subobjective priorities and their corresponding solution methodologies are studied in this work.The primary contributions of this study are as follows.First,a multiobjective optimal dispatch model for the standalone MG,which is composed of wind turbines (WTs),photovoltaics (PVs),diesel engine (DE) units,load,and battery energy storage system (BESS),is proposed.In this model,the economic cost,environmental protection,and power supply consistency are comprehensively taken into consideration,and the concerns of different stakeholders are expressed via varying priorities of the subobjectives.Second,the AHP algorithm is employed to reasonably evaluate the importance of various subobjectives by specifying weight coefficients for them.Furthermore,the quantum particle swarm optimization (QPSO) algorithm is proposed as the solution for improved convergence performance [18].Finally,simulation studies are performed on a test MG and the results are analyzed to draw conclusions.

      The remainder of this paper is organized as follows.In Section 1,the multiobjective optimal dispatch model is proposed considering economic cost,environmental protection,and power supply consistency.The solution methodology based on the AHP and QPSO algorithms are described in Section 2.Case studies are conducted on a test system to validate the optimal dispatch model and solution methodology,which are described in Section 3.Finally,the conclusions are presented in Section 4.

      1 Optimal dispatch model

      In this work,the MG is considered to be in the islanded mode.The multiobjective optimal dispatch model addresses the multiple concerns of different stakeholders,such as the MG operator,end power users,and societies with environmental concerns.

      1.1 Multiobjective optimization function

      A multiobjective optimization function of the MG,denoted as F,is composed of three subobjectives,i.e.,F1,F2,and F3,and can be expressed as follows:

      where F1 denotes the fuel as well as operation and maintenance (O&M) costs,and F2 and F3 denote the pollutant emission and load disruption costs,respectively.ω12,and ω3 are the weight coefficients of F1,F2,and F3,respectively,and are obtained by the AHP algorithm.As expressed in (2),F1 is composed of two parts,i.e.,fuel cost denoted as Cfuel(t) and O&M cost denoted as COM(t).

      The power outputs of PVs and WTs are mainly determined by solar radiation and wind velocity [19,20];therefore,no fuel costs are introduced by the PVs and WTs.With regard to the fuel cost of DE units,a quadratic function of the power output is employed as follows [21]:

      where Cfuel,DE(t) is the fuel cost of the DE,PDE(t) is the power output of the DE,and α,β,and γ are the fuel cost coefficients.In addition to the Cfuel(t),the COM(t) of WTs,PVs,DEs,and BESS are considered and evaluated as follows:

      where ζi,OM and Pi(t) are the O&M coefficient (OMC) and t-th power output of the i-th distributed generator (DG),respectively.The pollutant emission cost of the DE is defined as

      where τj and σj are the cost and emission coefficients of the j-th pollutant,respectively.Moreover,the load disruption cost is as expressed below:

      where Ploss(t) is the interrupted load in the t-th hour,and kloss is the penalty coefficient for load interruption.In the following case studies,the priorities of the critical and noncritical loads are considered by assigning different penalty coefficients.The noncritical loads will be interrupted first,and the penalty factor for the critical loads will be higher than those for the noncritical loads.

      1.2 Constraints

      The equality constraint shown in (7) represents the power balance among the load,DGs,and BESS.

      Here,PBESS(t) is the output power of the BESS in the t-th hour and is positive when the BESS discharges or negative otherwise;PL(t) is the load in the t-th hour.The inequality constraints shown in (8) specify the maximum and minimum power constraints of the DGs.

      where Pimin and Pimax are the permissible minimum and maximum power outputs of the i-th DG,respectively.In addition,the constraints with regard to the power and state of charge (SOC) of the BESS are considered as specified in(9) [22,23].

      where is the power limit of the BESS.SOCmin and SOCmax are the permissible minimum and maximum values of the SOC to protect the BESS from overcharge or overdischarge,respectively.

      2 Solution methodology

      The multiobjective optimal dispatch model specified in Section 1 is described in this section.First,the AHP algorithm is used to determine the weight coefficients of the subobjectives since it can effectively address multiattribute decision-making problems.The QPSO algorithm is then employed to solve the multiobjective optimization model.

      2.1 AHP algorithm

      Taking the economic cost,environmental conservation,and power supply consistency into consideration,reasonable weight coefficients of the subobjectives,i.e.,ω12,and ω3 are proposed by the AHP algorithm,which is composed of the following steps [24-26]:

      1) Establishment of the hierarchical AHP model

      2) Creation of judgment matrices

      3) Calculation of the weight coefficients

      4) Consistency checking

      The AHP model for optimal dispatch of the MG is summarized in Table1.

      Table1 Hierarchical AHP model of MG optimal dispatch

      Objective layer Criteria layer Attribute layer Optimal dispatch strategy Economic cost Cfuel COM Environmental conservation CCO2 CSO2 CNOX Power supply consistency Cload

      Here,CCO2,CSO2,and CNOX are the costs of CO2,SO2,and NOX emissions,respectively;Cload is the cost of load disruption.The judgment matrices are obtained by pairwise comparisons of the importance of factors from the same layer.The weight coefficient of each factor is determined by calculating the eigenvalue and eigenvector of the corresponding judgment matrix.The consistency ratio (CR)index is calculated for consistency checking;a CR less than or equal to 0.1 is considered acceptable in this work.

      2.2 QPSO algorithm

      The particle swarm optimization (PSO) algorithm generates a group of random initial solutions and searches for the optimal solution by iterative computations.However,the PSO has difficultly in converging to a global or even a local optimal solution [27].The QPSO,however,has been determined to have the advantage of fast convergence rate,and its fitness value is better than that of the traditional PSO [28,29].Hence,the QPSO is introduced to solve the optimization problem in this work.

      In QPSO,each particle is considered to be in a quantum state and formulated using a wave function of the Schrodinger equation.The particles will eventually converge to a certain region owing to the local attractor,which is defined as follows [30]:

      where i,j,and d denote the number of particles,number of dimensions of the solution space,and number of iterations,respectively;pi,j(d) is the local attractor.Pi,j(d) and Gj are the personal best (pbest) position of the particle and global best (gbest) position of the swarm,respectively.φi ,j ( d) is a random number with a uniform probability density function(PDF) on interval (0,1).

      In the solution space,the particles converge to the center of the well according to the PDF given by the quantum well and wave function.All particles are then updated using the following equations [31]:

      whereXi,j(d+1)is thepositionofparticleiin the(d+1)-th iteration;βisthe contraction-expansionfactor,whichcan control the convergence speed of the QPSO;Cj(d) is the centerofthebestposition oftheswarm;u i,j( d)isa random numberwitha uniformPDF ontheinterval(0,1);dmax is the maximum iteration number;M is the total number of particles that represent the potential solutions.The flowchart for optimal dispatch based on the AHP and QPSO is graphically shown in Fig.1.

      Fig.1 Flowchart for MG optimal dispatch based on AHP and QPSO algorithms

      3 Simulation studies

      3.1 Information of test system

      A test MG system,as shown in Fig.2,is applied in this work for the case study.The PVs,DE,WTs,and BESS are included to power the load,which is composed of critical and noncritical loads.

      Fig.2 Schematic of a standalone MG for case study

      The capacities of the PVs,i.e.,PV1,PV2,PV3,and PV4 are 12 kW,10 kW,8 kW,and 10 kW,respectively.The rated power and permissible minimum output of the DE is 30 kW and 9 kW,respectively.The detailed parameters of the WTs are denoted by WT1,WT2,WT3,WT4,WT5,and WT6,as specified in Table2.

      Table2 Parameters of the WTs

      Parameters WTs WT1 WT2 WT3 WT4 WT5 WT6 Cut-in speed (m/s) 4 4 3 3 3 3 Rated speed (m/s) 12 12 10 10 8 8 Cut-out speed (m/s) 24 24 25 25 20 20 Rated power (kW) 10 10 8 8 7 7

      The OMCs of the PVs,WTs,DE,and BESS used in this study are 0.0096 ¥/kWh,0.0296 ¥/kWh,0.0880 ¥/kWh,and 0.0027 ¥/kWh,respectively.The emission and cost coefficients of the various pollutants are listed in Table3.

      Table3 Emission and cost coefficients of pollutants

      Pollutants Emission coefficient(g/kWh)Cost coefficient(¥/kg)CO2 649 0.210 SO2 0.206 14.842 NOX 9.890 62.946

      A 24 hour simulation was conducted in steps of 1 hour.The hourly meteorological data employed in the simulations,such as temperature,radiation intensity,and wind speed,are summarized in Table4.

      Table4 Hourly meteorological data employed in the simulations

      Time (h) Temperature(°C)Radiation intensity(kW/m2) Wind speed (m/s)1 13.9 0 4.05 2 12.1 0 5.16 3 11.5 0 4.92 4 11.3 0 6.71 5 12.7 0 7.88 6 13.4 0 7.3 7 13.2 0 7.87 8 14.2 0.004 7.6 9 14.4 0.1406 10.3 10 16.8 0.3899 6.28 11 17.3 0.7029 10.42 12 17.8 0.8345 9.29 13 18.8 1.044 7.63 14 20.9 0.7673 8.65 15 20.1 0.9872 7.27 16 20.7 0.7392 3.75 17 20.3 0.4633 4.15 18 20.2 0.2378 4.52 19 18.5 0.0259 3.48 20 16.3 0 3.17 21 16.2 0 2.9 22 15.2 0 2.44 24 14.2 0 4.41 24 14.6 0 3.59

      Based on the meteorological data,the available power values of the WTs and PVs are calculated and illustrated in Fig.3.

      The hourly varying load,which is composed of critical and noncritical components,is employed in this study.The load and its critical component are shown in Fig.4.

      Fig.3 Available power of PVs and WTs

      Fig.4 Hourly varying load and its critical component

      3.2 Simulation results and analyses

      The optimal dispatch for the test system involves two basic steps.First,the weight coefficients of the criteria layer,i.e.,the weight coefficients of the subobjectives,are determined by the AHP algorithm.Then,the QPSO algorithm is used to determine the solutions of the optimal dispatch strategy.It should be noted that different stakeholders of the MGs give different priorities to the subobjectives.Seven sets of priorities of the weight coefficients can thus be proposed for the optimal dispatch model of the MGs,namely case 1:ω1>ω2>ω3,case 2:ω1>ω3>ω2,case 3:ω2>ω1>ω3,case 4:ω2>ω3>ω1,case 5:ω3>ω2>ω1,case 6:ω3>ω1>ω2,and case 7:ω123.In this work,all of these cases have been considered,and the corresponding weight coefficients are determined using the AHP algorithm.Consider case 1 as an example;the weight coefficients of the attribute and criteria layers are calculated successively.The results of pairwise comparisons and weight coefficients of the attribute layer by the AHP are shown in Table5.

      The weight coefficients of the criteria layer,i.e.,ω12,and ω3 are further derived based on the pairwise comparisons,whose computational results are summarized in Table6.

      Table5 Pairwise comparisons and weight coefficients of the attribute layer

      Factors Factors Weight coefficients Cfuel COM CCO2 CSO2 CNOX Cload Cfuel 1 3////0.7500 COM 1/3 1////0.2500 CCO2//1 5 3/0.6556 CSO2//1/5 1 3/0.1578 CNOX//1/3 1/3 1/0.1866 Cload/////1 1.0000

      Table6 Pairwise comparison and weight coefficients of criteria layer

      Factors Factors Weight coefficients CR F1 F2 F3 F1 1 3 5 0.6333 0.0372 F2 1/3 1 3 0.2605 F3 1/5 1/3 1 0.1062

      Note that the CR of case 1 is 0.0372,which is less than 0.1;therefore,the consistency of the weight coefficients in Table5 is acceptable.

      The remaining six sets of priorities of the weight coefficients are similarly analyzed,and ω12,and ω3 are accordingly specified by employing the AHP algorithm.Then,the optimal dispatch models with different sets of weight coefficients are solved based on the QPSO algorithm;these computational results are listed in Table7.

      It can be seen that the consistency can be verified and accepted for all cases since the CRs are all less than 0.1.Meanwhile,the solution methodology based on the AHP and QPSO present attractive capabilities and adaptability for MG dispatch considering multiple concerns.Moreover,it is clearly illustrated that the priorities of the subobjectives produce different results for the objective function F.Hence,comprehensive investigations and assessments are needed to propose reasonable priorities for the subobjectives that can be accepted by multiple stakeholders.

      Table7 Optimization results for various subobjective priorities

      Cases Priorities Results ω1 ω2 ω3 F/¥ CR 1 ω1>ω2>ω3 0.6333 0.2605 0.1062 247.4652 0.0372 2 ω1>ω3>ω2 0.6555 0.1578 0.1867 232.2314 0.0281 3 ω2>ω1>ω3 0.4055 0.4796 0.1150 257.9295 0.0280 4 ω2>ω3>ω1 0.1062 0.6333 0.2605 249.6452 0.0372 5 ω3>ω2>ω1 0.1578 0.1875 0.6555 179.9897 0.0281 6 ω3>ω1>ω2 0.1062 0.2605 0.6333 186.5540 0.0372 7 ω1=ω2=ω3 0.3333 0.3333 0.3333 225.0007 0.0000

      In addition to the objective function F,the decision variables,such as outputs of the DE,discharge/charge power of the BESS,and disrupted load,are solved by the QPSO algorithm,for example,ω1 = 0.1578,ω2 = 0.1875,and ω3 = 0.6555 in case 5.The computational results of the decision variables are shown graphically in Fig.5,and the BESS capacity is 96 kW.Further,the influences of different BESS capacities on the optimal dispatch are studied.Figs.6 and 7 show the dispatch results for BESS capacities of 48 kW and 192 kW,respectively.

      First,the optimal dispatch provides the prerequisite for complete accommodation of the PVs and WTs.Second,as illustrated in Figs.5,6,and 7,different BESS capacities have different influences on the optimal dispatch results.The BESS mitigates the imbalance between the power demand and power supply resulting from fluctuations of the PVs,WTs,and load.When the total power generated by the PVs and WTs is greater than that required for the load,

      Fig.5 Outputs of BESS and DE corresponding to the optimal result

      Fig.6 Optimal result with 48 kW BESS capacity

      Fig.7 Optimal result with 192 kW BESS capacity

      the redundant power is absorbed by the BESS.Otherwise,the BESS discharges and provides supplementary power.Moreover,the DE operates as a standby when necessary to address power shortages within its capacity.For example,the total power of the WTs and PVs at 16:00 in Fig.5 is 31.3317 kW,which is less than that required for the load;consequently,the BESS discharges the additional 19.2 kW of power,and the DE outputs a rated power of 30 kW.However,the load cannot be completely powered in this situation,and the noncritical load of 4.4683 kW is thus disrupted.

      4 Conclusion

      In this study,a multiobjective optimal dispatch model has been developed for a standalone MG.During the development of the model,multiple objectives regarding the economic costs,pollutant emissions,and power supply consistency are comprehensively considered.A solution methodology based on the AHP and QPSO algorithms is then developed.First,the weight coefficients of each objective are determined by the AHP,and the optimal dispatch strategy among these is derived using the QPSO algorithm.The optimized results of the multiple objectives with different weight coefficients are determined,and the output power values of the PVs,WTs,BESS,and DE are obtained.Thus,it can be concluded from these case studies that the BESS and DE prompt consistency in the power supply and accommodation of renewable energy in the dispatch of the MGs.The MG grid structure was not considering in this study.And there were some limitations in reliability study.In the future,we will continue to study the multiobjective optimal dispatch model and solution methodology by evaluating cases for systems that are closer to engineering reality.

      Acknowledgments

      This work was supported by State Grid Corporation Science and Technology Project (520605190010).

      Declaration of Competing Interest

      We declare that we have no conflict of interest.

      References

      1. [1]

        Song X,Xu W,Zhou J,et al (to be published) Selective datadriven algorithm proposed for reliability evaluation of microgrid with sequential multi-state uncertainties.High Voltage Eng,DOI:10.13336/j.1003-6520.hve.20200310016 [百度学术]

      2. [2]

        Ma W,Wang J,Gupta V,et al (2018) Distributed energy management for networked microgrids using online ADMM with regret.IEEE Trans Smart Grid 9(2):847-856 [百度学术]

      3. [3]

        Liu S,Yu W,Gao W,et al (2016) Multi-objective optimization dispatch of PV-MG considering demand response actions.In:2016 35th Chinese Control Conference (CCC),Chengdu,China,2728-2733,2016 [百度学术]

      4. [4]

        Pourghasem P,Sohrabi F,Mohammadi-Ivatloo B,et al (2017)Reliable economic dispatch of microgrids by exchange market algorithm.In:2017 Smart Grid Conference (SGC),Tehran,Iran,1-5,2017 [百度学术]

      5. [5]

        Jiang H,Ning S,Ge Q (2019) Multi-objective optimal dispatching of microgrid with large-scale electric vehicles.IEEE Access 7:145880-145888 [百度学术]

      6. [6]

        Al-Bahrani LT,Patra JC,Stojcevski A (2018) Solving economic dispatch problem under valve- point loading effects and generation constrains using a multi-gradient PSO algorithm.In:2018 International Joint Conference on Neural Networks(IJCNN),Rio de Janeiro,Brazil,1-8,2018 [百度学术]

      7. [7]

        Du Y,Qi Z,Yu G (2017) Dynamic optimal dispatch for standalone microgrid.In:2017 Chinese Automation Congress (CAC),Jinan,China,7237-7240,2017 [百度学术]

      8. [8]

        Zhao J,Xu Z (2017) Ramp-limited optimal dispatch strategy for PV-embedded microgrid.IEEE Trans Power Syst 32(5):4155-4157 [百度学术]

      9. [9]

        Liu Y,Ai Q,Yu Z,et al (2014) Microgrid optimal dispatch considering multiple factors evaluation.Power Syst Protect Control 42(23):23-30 [百度学术]

      10. [10]

        Zhu L,Zhou XY,Tang LJ,et al (2017) Multi-objective optimal operation of microgrid considering load shedding.Grid Technol 41(06):1847-1854 [百度学术]

      11. [11]

        Wang H,Ai Q,Wu HJ,et al (2018) A two-layer distributed dispatch method based on alternating direction multiplier method for micrigrid group.Grid Technol 42(06):1718-1727 [百度学术]

      12. [12]

        Cheng QM,Cheng YM,Huang S,et al (2018) Summary of microgrid economic optimization operation.Guangdong Electr Power 31(2):1-9 [百度学术]

      13. [13]

        Xin Z,Chen L,Yang Y,et al (2019) Application of AHP-DEA model in comprehensive evaluation of distribution network planning reliability.In:2019 IEEE Sustainable Power and Energy Conference (iSPEC),Beijing,China,290-294,2019 [百度学术]

      14. [14]

        Amandeep,Mohammad F,Yadav V (2015) Automatic decision making for multi-criteria load balancing in cloud environment using AHP.In:International Conference on Computing,Communication &Automation,Noida,India,569-576 [百度学术]

      15. [15]

        Yaraghi N,Tabesh P,Guan P,et al (2015) Comparison of AHP and Monte Carlo AHP under different levels of uncertainty.IEEE Trans Eng Manage 62(1):122-132 [百度学术]

      16. [16]

        Sarfi V,Livani H,Yliniemi L (2017) A new multi-objective economic-emission dispatch in microgrids.In:2017 IEEE Power&Energy Society General Meeting,Chicago,IL,USA,1-5,2017 [百度学术]

      17. [17]

        Wang C,Pan L,Fang L,et al (2018) Optimal dispatch of an island MG including a multiple energy storage system.In:2018 2nd IEEE Conference on Energy Internet and Energy System Integration (EI2),Beijing,China,1-5 [百度学术]

      18. [18]

        Xie X,Wang H,Tian S,et al (2015) Optimal capacity configuration of hybrid energy storage for an isolated microgrid based on QPSO algorithm.In:2015 5th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies (DRPT),Changsha,China,2094-2099 [百度学术]

      19. [19]

        Liu H (2019) Research on energy management strategy of microgrid based on demand side response.Jiangnan University [百度学术]

      20. [20]

        Li Y,Wang P,Gooi HB,et al (2019) Multi-objective optimal dispatch of microgrid under uncertainties via interval optimization.IEEE Trans Smart Grid 10(2):2046-2058 [百度学术]

      21. [21]

        Song X,Zhao Y,Zhou J,et al (2019) Reliability varying characteristics of PV-ESS-based standalone microgrid.IEEE Access 7:120872-120883 [百度学术]

      22. [22]

        Ammar H,Boukebbous SE,Benbaha N (2018) Photovoltaic water pumping system site suitability analysis using AHP GIS method in southern Algeria.In:2018 4th International Conference on Renewable Energies for Developing Countries(REDEC),Beirut,lebanon,1-5 [百度学术]

      23. [23]

        Mahonen,and A.P.“Cytokinin Signaling and Its Inhibitor AHP6 Regulate Cell Fate During Vascular Development.” Science 311.5757:94-98 [百度学术]

      24. [24]

        Cong K,Shaojun W,Yaoyao W,et al (2017) Application of AHP-FCA modeling in visual guided manipulator.In:2017 2nd International Conference on Robotics and Automation Engineering (ICRAE),Shanghai,China,121-125 [百度学术]

      25. [25]

        Patidar H,Mahanti A,Sharma R,et al (2016) Comparative performance of QPSO and BSA for design of linear array of parallel dipole antennas with mutual coupling.In:2016 International Conference on Microelectronics,Computing and Communications (MicroCom),Durgapur,India,1-4 [百度学术]

      26. [26]

        Filho RNDC (2018) Optimal capacitor placement in radial distribution system using QPSO.In:2018 Simposio Brasileiro de Sistemas Eletricos (SBSE),Niteroi,Brazil,1-6 [百度学术]

      27. [27]

        Yang Y (2016) Economic optimization scheduling of micro grid based on QPSO.Hangzhou University of Electronic Science and Technology [百度学术]

      28. [28]

        Chen M,Ruan J,Xi D (2018) Micro grid scheduling optimization based on quantum particle swarm optimization (QPSO)algorithm.In:2018 Chinese Control And Decision Conference(CCDC),Shenyang,China,6470-6475 [百度学术]

      29. [29]

        Zhu S,Luo P,Yang Y,et al (2017) Optimal dispatch for gridconnecting microgrid considering shiftable and adjustable loads.In:IECON 2017 - 43rd Annual Conference of the IEEE Industrial Electronics Society,Beijing,China,5575-5580 [百度学术]

      Fund Information

      supported by State Grid Corporation Science and Technology Project (520605190010);

      supported by State Grid Corporation Science and Technology Project (520605190010);

      Author

      • Yuxin Zhao

        Yuxin Zhao was born in Heilongjiang,China,in 1995.She received her BEng in electrical engineering and its automation from the Heilongjiang Bayi Agricultural University,Daqing,China,in 2018.She is currently pursuing her MS in electrical engineering with north China university of technology.Her research interests include optimal dispatch of microgrids and distributed generation.

      • Xiaotong Song

        Xiaotong Song received his BEng and PhD in electrical engineering from Shandong University,Ji’nan,China,in 2003 and 2008,respectively.He was a Senior Engineer with China Electric Power Research Institute(CEPRI) during 2008 to 2014.He is currently an Associate Professor of the School of Electrical and Control Engineering,North China University of Technology (NCUT),Beijing,China.His research interests include power system reliability assessment,microgrid,and energy storage systems.Dr.Song was a recipient of the Grand Prize of State Grid Awards for Science and Technology Progress in 2013.

      • Fei Wang

        Fei Wang received his BEng and MS in electrical engineering from Shandong University,China,in 2003 and 2007,respectively.He is now a Senior Engineer of the State Grid Shandong Electric Power Company.His research interests include power system reliability analysis and power grid planning.

      • Dawei Cui

        Dawei Cui received the master degree of Electrical engineering from Wuhan University in 2006.He is O&M manager of the State Grid Brazil Holding S.A.,major in the transmission operation,maintenance and R&D projects implementation,Senior engineer.His study interest includes power grid stability,new energy integration and foreign transmission regulatory policy study.He was one of the receipts of first prize of State Grid science &technology progress in 2013,one of the receipts of first prize of China National Power industry Science and Technology Progress in 2016.

      Publish Info

      Received:2020-06-02

      Accepted:2020-08-23

      Pubulished:2020-12-25

      Reference: Yuxin Zhao,Xiaotong Song,Fei Wang,et al.(2020) Multiobjective optimal dispatch of microgrid based on analytic hierarchy process and quantum particle swarm optimization.Global Energy Interconnection,3(6):562-570.

      (Editor Yanbo Wang)
      Share to WeChat friends or circle of friends

      Use the WeChat “Scan” function to share this article with
      your WeChat friends or circle of friends